top of page

Some recent projects we have worked on are listed below

Trinity River Restoration Project, Junction City, CA

Hwy 299 Soldier Pile Retaining Walls between Blue Lake and Willow Creek

Hwy 299 Paving between Hwy 101 and Blue Lake

Hwy 299 Paving over Lord Ellis summit

Paving on Hwy 101 from Eureka to Hookton Rd.

Hwy 36 Retaining walls at various locations

PG&E gas line installation/repair, Myrtle ave Eureka

Arcata/Eureka Airport runway resurfacing

Alderpoint Rd slipout repair

4th st Eureka Repaving/ADA improvements

Trinidad stormwater runoff infiltration basins

Below are pictures from recent work and past Eureka Truckers Christmas Parade pictures and videos.

20230928_110300
20230214_075346
0118240930_HDR
20240821_115104
0427211208
0812221010
IMG_1061
IMG_1551
IMG_1060
0812221008
20200420_170648
20220317_093725
supertag
20191121_100342
705517747363667523_edited
3364061639212775543
20181018_090246.jpg
20180803_111111.jpg
20181207_162317.jpg
20190711_092849.jpg
20190108_094842.jpg
VideoCapture_20220407-124328
20171209_172027
20171209_172036
20171209_165119
8987014061262852564.jpg
Supertag at Christmas 2021
End Dump at Christmas 2021
bottom of page